PROJECTS: UBER Headquarters Mission Bay Quezada Architecture (SF) worked in collaboration with SHoP Architects (NY) in designing and building the newUBER Headquarters (423,000 sf) located in the Mission Bay of San Francisco, CA. Scheduled Completion 2018.
RESPONSIBLITIES: Managed a team of 15 through the BIM process from trouble-shooting to file organization, executing and completing permit sets and construction documents for bidding and construction. Software used includes Revit, Navisworks, AutoCAD, Rhino, Photoshop, Illustrator along with some computer programming using JavaScript.
PROJECTS: GOOGLE Creative Lab - NY Office Commericial Office Interiors.
RESPONSIBLITIES: Managed the BIM process from trouble-shooting to file organization, designing and preparing presentation & fabrication drawings using Revit, Rhino, AutoCAD, Photoshop & Illustrator
PROJECTS: High End Residential, Hospitality (Hotel in Spain), Small Museum
RESPONSIBILITIES: 3D modeled (Rhino) design concepts to study as well as produced presentation drawings using Rhino, AutoCAD, Photoshop & Illustrator
PROJECTS: Cathedral Hill Hospital ($1.7 Billon CPMC Healthcare), Cal Memorial Football Stadium ($321 million Berkeley, CA)
RESPONSIBLITIES: Prepared Construction Documents & shop drawings using the BIM process and software (Revit). Assisted with Specifications, Bid Cost Estimation and Quantity Take-Offs (OnScreen). Drafted millwork andtransition details for the production of exterior cladding from the in-house fabrication shop
PROJECTS: Cambridge Hotel (Affordable Housing - Tenant Improvement), Educational, Restaurant, High-End Residential/P>
RESPONSIBILITIES: Assisted in project managing, coordinating consultants and performing Construction Administration Services. Prepared drawings using AutoCAD for Schematic Design, Design Development, and Construction Documents for permitting and construction